The demolition started today. There are 3 masons assigned to the job and they will be making a lot of noise for the next few days. I have a hose bibb and an outlet at the front of the house, which is great because I won’t have to string a power cord out the window. The contractor wanted a second outlet though since the jack hammers take up a lot of power. We strung a power cord through the cellar hatch to get to a second outlet.
Brownstone Facade Restoration, demolition